Owocujące truskawki na rynnach uprawowych w tunelu zblokowanym

Strawberry tunnels — which tunnel for growing strawberries

For strawberries we build single and multibay tunnels. A single tunnel is warmer, so it works better for a very early harvest; a multibay one comes out cheaper per m² on a large area and collects rainwater in gutters.

  • 6–11 m bay width
  • E370+Z275 leg and anchor steel
  • from 23 zł/m² net per m², with film, excluding transport and assembly
  • 3 years warranty on the film
Ścieżka między dwoma rzędami truskawek w tunelu z łukiem gotyckim

Why growers cover strawberries

The tunnel protects the plantation from rain, wind and cold, and it also extends the season: under film the plants start earlier and fruit longer than in the open field.

For the grower this is above all a predictable harvest — the fruit does not get wet during picking, and delivery dates depend less on the weather.

Owocujące truskawki w rynnach na stojakach wzdłuż ścieżki w tunelu

In the soil or on gutters

Strawberries in our tunnels grow in the soil or in substrate on gutters and growing tables — at working height, without bending down at harvest.

We supply growing systems together with the tunnel and match them to the row spacing. See [growing systems](/en/growing-systems/).

Which tunnel for Strawberry tunnels?

We decide the structure in the field, during a sales visit. These are the two types we build.

Single tunnels (Solo)

For strawberries: a very early harvest — a single tunnel is warmer.

Parametry: Single tunnels
Structurehoops on ground anchors screwed into the soil
Ground anchors700, 850, 1000 mm; with an upset 1.25–2.0 m; steel E370+Z275
Hoop tubesØ40, Ø50.8, Ø60.3 mm; oval 80×40, 90×50 mm; steel S350+Z275
Heightup to 5 m on upset anchors
Width6–11 m, round or gothic arch
Pricefrom 28 zł/m² net (steel structure with film, excluding transport and installation)
Single tunnels — specifications and offer

Multibay tunnels (Multibay)

For strawberries: a large area, lower cost per m² and gutters for rainwater.

Parametry: Multibay tunnels
StructureY-legs screwed into the soil
Y-legsØ40, Ø50.8, Ø60.3 mm; length 2.5–3.5 m; steel E370+Z275
Hoop tubesØ40, Ø50.8, Ø60.3 mm; oval 80×40, 90×50 mm; steel S350+Z275
Guttersbetween the bays, rainwater collection
Width6–11 m, round or gothic arch
Pricefrom 23 zł/m² net (steel structure with film, excluding transport and installation)
Multibay tunnels — specifications and offer

Structure

Y-legs and ground anchors in E370+Z275 steel, hoops in S350+Z275 steel. We give the parameters straight.

Montaż tunelu zblokowanego: wręgi zbiegające się na nodze z łącznikiem Y

E370+Z275

Y-legs and ground anchors in stronger steel

E370+Z275 steel is c. 10% stronger than classic S350+Z275 — and it costs you the same.

Gatunki stali w konstrukcji
Y-legsE370+Z275
Ground anchorsE370+Z275
HoopsS350+Z275
Szerokość nawy6–11 m
Rury na wręgiowalne 80×40 / 90×50 mm

Reinforcements for Strawberry tunnels tunnels

Lattice cables are standard in multibay tunnels, the ridge tube — in single tunnels. You add T or V horizontal bracing as an option for both types.

  1. Diagram of three bays of a multibay tunnel with lattice cables marked in red: diagonal cables from the legs to the hoops form a net inside the tunnel.

    Standard in multibay

    Lattice cables

    They hold the tunnel in the wind and partly relieve it under snow.

  2. Diagram of three tunnel bays with the ridge tube marked in red: the tube runs under the peak of the arches along the full length of the bay.

    Standard in single tunnels

    Ridge tube

    It stiffens the tunnel from above and stops the arches from spreading.

  3. Cross-section of three tunnel bays with V horizontal bracing marked in red: a horizontal tube in the upper part of the arch and two short diagonal braces to the hoop.

    Option in both types

    T or V horizontal bracing

    It strengthens the tunnel most against snow.

Strongest combination in multibay tunnels

Lattice cables + horizontal bracing

Best in a T or V variant — both are similarly effective. The cables hold the tunnel in the wind, and the bracing together with the hoop forms a truss that carries the snow.

Reinforcements in detail

How much does a tunnel for Strawberry tunnels cost?

Multibay tunnels: from 23 zł/m² net for the steel structure with film.

The price excludes transport and assembly. Assembly: from 8 zł/m² net. Single tunnels: from 28 zł/m² net.

Price list and what affects the price

from 23 zł/m²

net, steel structure with film, excluding transport and installation

Multibay tunnels — indicative prices, net, steel structure with film, excluding transport and installation. Updated: 13 October 2026. Indicative figures, not an offer under the Civil Code.

From enquiry to a tunnel in the field

  1. Enquiry

    You call, write or fill in the configurator: crop, field dimensions, timing.

  2. Site visit

    We match the tunnel type, bay width, tube profile and arch shape to the crop and the conditions in the field.

  3. Production

    We make the structure and accessories at our own plant in Bralin (Wielkopolska Voivodeship) — c. 10 ha of tunnels per month.

  4. Delivery

    We bring the packed parts to the field, and the tubes are bent on site, at the customer's. Transport is quoted separately.

  5. Assembly

    We assemble the tunnels as a full service or support your crew with our fitter. Assembly: from 8 zł/m² net.

Frequently asked questions

Which tunnel for strawberries — single or multibay?

For a very early crop we recommend a single tunnel, because it is warmer inside. On larger areas a multibay tunnel comes out cheaper per m² and has gutters for rainwater.

How much do strawberry tunnels cost?

Multibay tunnels: Multibay tunnels: from 23 zł/m² net. Single tunnels: from 28 zł/m² net. Steel structure with film, excluding transport and installation.

Can strawberries in a tunnel be grown on gutters?

Yes. Besides tunnels we supply growing systems — gutters and tables — for growing strawberries at working height.

Let's talk about tunnels for Strawberry tunnels

Call or configure a tunnel online — a sales advisor will get back to you with an offer.

CallConfigurator