Blok tuneli zblokowanych Progress Tunnels z lotu ptaka, wśród pól rzepaku

Polytunnel manufacturer for soft fruit

Single and multibay tunnels from our own production — plant in Bralin (Wielkopolska).

Multibay tunnels: from 23 zł/m² netsteel structure with film, excluding transport and installation

  • 30 years of experience
  • 10 ha of tunnels per month
  • c. 220 employees
  • 2 plants in Poland

Single tunnel or multibay?

Multibay tunnels are bays joined into one block on shared legs, with gutters for rainwater and a lower cost per m². Single tunnels stand separately on ground anchors — it is warmer inside, so they work well for very early crops.

Single tunnels (Solo)

Free-standing tunnels, each hoop anchored on both sides. Fast assembly and the option to relocate.

Parametry: Single tunnels
Structurehoops on ground anchors screwed into the soil
Ground anchors700, 850, 1000 mm; with an upset 1.25–2.0 m; steel E370+Z275
Hoop tubesØ40, Ø50.8, Ø60.3 mm; oval 80×40, 90×50 mm; steel S350+Z275
Heightup to 5 m on upset anchors
Width6–11 m, round or gothic arch
Pricefrom 28 zł/m² net (steel structure with film, excluding transport and installation)
Single tunnels — specifications and offer

Multibay tunnels (Multibay)

Bays joined side by side on shared rows of Y-legs screwed into the soil, with gutters between the bays.

Parametry: Multibay tunnels
StructureY-legs screwed into the soil
Y-legsØ40, Ø50.8, Ø60.3 mm; length 2.5–3.5 m; steel E370+Z275
Hoop tubesØ40, Ø50.8, Ø60.3 mm; oval 80×40, 90×50 mm; steel S350+Z275
Guttersbetween the bays, rainwater collection
Width6–11 m, round or gothic arch
Pricefrom 23 zł/m² net (steel structure with film, excluding transport and installation)
Multibay tunnels — specifications and offer

Stronger steel at the same price

We have manufactured steel structures since 1995. We state the specifications plainly — just as in the offer.

Ocynkowane nogi i elementy konstrukcji tuneli na palecie na placu zakładu w Bralinie

E370+Z275

Y-legs and ground anchors in stronger steel

E370+Z275 steel is c. 10% stronger than classic S350+Z275 — and it costs you the same.

Gatunki stali w konstrukcji
Y-legsE370+Z275
Ground anchorsE370+Z275
HoopsS350+Z275
90×50 mm
Oval hoop tube: 29% higher strength than 80×40 at a similar price.
100%
of accessories from our own production: ground anchors, clamps, clips, connectors, film and gutter fastenings.
ISO
9001, 1090 and 3834 — quality management, steel structures and welding.
3 years
warranty on the film.

Reinforcements against wind and snow

Lattice cables are standard in multibay tunnels, the ridge tube — in single tunnels. You add T or V horizontal bracing as an option for both types.

  1. Diagram of three bays of a multibay tunnel with lattice cables marked in red: diagonal cables from the legs to the hoops form a net inside the tunnel.

    Standard in multibay

    Lattice cables

    They hold the tunnel in the wind and partly relieve it under snow.

  2. Diagram of three tunnel bays with the ridge tube marked in red: the tube runs under the peak of the arches along the full length of the bay.

    Standard in single tunnels

    Ridge tube

    It stiffens the tunnel from above and stops the arches from spreading.

  3. Cross-section of three tunnel bays with V horizontal bracing marked in red: a horizontal tube in the upper part of the arch and two short diagonal braces to the hoop.

    Option in both types

    T or V horizontal bracing

    It strengthens the tunnel most against snow.

Strongest combination in multibay tunnels

Lattice cables + horizontal bracing

Best in a T or V variant — both are similarly effective. The cables hold the tunnel in the wind, and the bracing together with the hoop forms a truss that carries the snow.

Reinforcements in detail

How much does a multibay tunnel cost?

Multibay tunnels: from 23 zł/m² net for the steel structure with film.

The price excludes transport and assembly. Assembly: from 8 zł/m² net. Single tunnels: from 28 zł/m² net.

Price list and what affects the price

from 23 zł/m²

net, steel structure with film, excluding transport and installation

Indicative figures, not an offer under the Civil Code. Updated: 13 October 2026.

From enquiry to a tunnel in the field

  1. Enquiry

    You call, write or fill in the configurator: crop, field dimensions, timing.

    Stoisko Progress Tunnels na targach rolniczych pod konstrukcją tunelu foliowego, z miejscem do rozmów z klientami
  2. Site visit

    We match the tunnel type, bay width, tube profile and arch shape to the crop and the conditions in the field.

    Zaorane pole przygotowane pod budowę tuneli foliowych, w tle blok tuneli przy polnej drodze
  3. Production

    We make the structure and accessories at our own plant in Bralin (Wielkopolska Voivodeship) — c. 10 ha of tunnels per month.

    Hala produkcyjna zakładu Progress Engineering z elementami konstrukcji tuneli
  4. Delivery

    We bring the packed parts to the field, and the tubes are bent on site, at the customer's. Transport is quoted separately.

    Załadunek elementów konstrukcji tuneli na naczepę wózkiem widłowym
  5. Assembly

    We assemble the tunnels as a full service or support your crew with our fitter. Assembly: from 8 zł/m² net.

    Stalowa konstrukcja tunelu w trakcie montażu na polu, przed naciągnięciem folii

Frequently asked questions

How much do multibay tunnels cost?

Multibay tunnels: from 23 zł/m² net. Single tunnels: from 28 zł/m² net. Steel structure with film, excluding transport and installation.

How much does tunnel assembly cost?

Assembly: from 8 zł/m² net. We assemble as a full service or support your crew with our fitter; tubes are bent in the customer's field.

Single tunnel or multibay — which should I choose?

Multibay tunnels join bays into one block, have gutters for collecting rainwater and come out cheaper per m². Single tunnels stand separately on ground anchors; it is warmer inside, so they work better for a very early crop.

Will the tunnels withstand wind and snow?

We make Y-legs and ground anchors from E370+Z275 steel — c. 10% stronger than classic S350+Z275, at the same price; hoops from S350+Z275 steel, in multibay tunnels also from oval tubes 80×40 and 90×50 mm. A gothic arch sheds rain and snow better. As standard, multibay tunnels have lattice cables on every hoop (they strengthen against wind), and single tunnels have a ridge tube. As an option for both types we add T or V horizontal bracing, which strengthens the tunnel most against snow. We match the structure to the conditions in the field.

What is the warranty?

We give a 3-year warranty on the film.

Do you help with grants?

We will prepare an offer for a funding application (ARiMR, KPO). You can check the terms and call deadlines at the institution that runs them.

Let's talk about your field

Call or configure a tunnel online — a sales advisor will get back to you with an offer.

Our brands:QuramoAqua-lifeBiocomforti

CallConfigurator